Automated assembly of components
Automated assembly rarely pays off for speed alone. It pays off because every joining step is monitored and recorded, and because a machine does not get tired. The evidence that assembly was done correctly is frequently worth more than the minute saved.

Practice
Application examples
01Scope of services
What is included
Joining technology
Screwing, pressing, clipping, bonding, dosing or staking, depending on the part and the required joint quality.
Process monitoring
Torque and angle when screwing, force-displacement curve when pressing, quantity and bead position when dosing.
Part presentation
Feeding of the joining partners, frequently the most demanding part of the assembly cell.
Inspection steps inside the cell
Presence checking after joining, so a defect does not first surface at the end of the line.
Recording
Values per joint with part identifier, exportable to a QM system or production database.

Standards
What we work to
VDI/VDE 2862
Minimum requirements for screw systems and tools. The guideline classifies screw joints by risk and derives requirements for monitoring and documentation from that.
DIN EN ISO 13849-1
Safety-related parts of control systems. Joining forces and moving tools are hazards whose safeguarding needs a performance level.
DIN EN ISO 12100
Risk assessment and risk reduction. The basis for the guarding concept of the whole assembly cell.
Process
How it runs
- 01
Record the assembly sequence
Which steps in which order, with which joining partners and what cycle time?
- 02
Joining trials
Practical test per joining step on real parts, including the question of what a faulty joint looks like.
- 03
Concept
Cell layout, joining technology, feeding, monitoring, guarding concept, rough costing.
- 04
Build and pre-acceptance
Manufacturing, programming, trials with your parts in house.
- 05
Commissioning
Installation on site, fine-tuning of the monitoring windows, instruction.
Why CheckTec
Why us

Monitoring per joint
An assembly cell without process monitoring is fast manual assembly. Only the values per joint turn automation into evidence.
Inspecting inside the cell instead of at the end
We build test systems. A presence check after the critical joining step costs little and saves disassembly at the end of the line.
Feeding is taken seriously
The joining process is usually manageable. What stops assembly cells is the presentation of the joining partners. That is exactly where our focus lies.
Frequently asked questions
Frequently asked questions
From what quantity does automated assembly pay off?
It is not quantity alone that decides, but the combination of cycle time, defect cost, ergonomics and staff availability. There are low-volume cells that pay for themselves because they replace a physically demanding workplace or because proof of joint quality is required.
How is the quality of a screw joint proven?
Via torque and angle, evaluated against a window rather than an end value. VDI/VDE 2862 classifies screw joints by risk and derives from that how precisely monitoring and documentation have to be done. Which category your joint falls into is set by your design.
Can a manual assembly station be automated step by step?
Yes, and often that is the better route. The step with the highest defect cost or the greatest physical load is automated first. The precondition is that the cell is designed for extension from the outset.
Related services
Related
Enquiry
Tell us what it is about
A short description is enough for the first step. If it gets technical, we call.
Prefer to go direct? To the contact page
Step 2 of 3