Automated assembly rarely pays off for speed alone. It pays off because every joining step is monitored and recorded, and because a machine does not get tired. The evidence that assembly was done correctly is frequently worth more than the minute saved.

Measuring device on a stainless steel pipe, connected with two green Profinet cables

Practice

Application examples

Application example to follow.

01Scope of services

What is included

Joining technology

Screwing, pressing, clipping, bonding, dosing or staking, depending on the part and the required joint quality.

Process monitoring

Torque and angle when screwing, force-displacement curve when pressing, quantity and bead position when dosing.

Part presentation

Feeding of the joining partners, frequently the most demanding part of the assembly cell.

Inspection steps inside the cell

Presence checking after joining, so a defect does not first surface at the end of the line.

Recording

Values per joint with part identifier, exportable to a QM system or production database.

Close-up of the cabinet fit-out: power supply, circuit breakers and a labelled terminal row

Standards

What we work to

VDI/VDE 2862

Minimum requirements for screw systems and tools. The guideline classifies screw joints by risk and derives requirements for monitoring and documentation from that.

DIN EN ISO 13849-1

Safety-related parts of control systems. Joining forces and moving tools are hazards whose safeguarding needs a performance level.

DIN EN ISO 12100

Risk assessment and risk reduction. The basis for the guarding concept of the whole assembly cell.

Process

How it runs

  1. 01

    Record the assembly sequence

    Which steps in which order, with which joining partners and what cycle time?

  2. 02

    Joining trials

    Practical test per joining step on real parts, including the question of what a faulty joint looks like.

  3. 03

    Concept

    Cell layout, joining technology, feeding, monitoring, guarding concept, rough costing.

  4. 04

    Build and pre-acceptance

    Manufacturing, programming, trials with your parts in house.

  5. 05

    Commissioning

    Installation on site, fine-tuning of the monitoring windows, instruction.

Why CheckTec

Why us

Measuring device on a stainless steel pipe, connected with two green Profinet cables

Monitoring per joint

An assembly cell without process monitoring is fast manual assembly. Only the values per joint turn automation into evidence.

Inspecting inside the cell instead of at the end

We build test systems. A presence check after the critical joining step costs little and saves disassembly at the end of the line.

Feeding is taken seriously

The joining process is usually manageable. What stops assembly cells is the presentation of the joining partners. That is exactly where our focus lies.

Frequently asked questions

Frequently asked questions

From what quantity does automated assembly pay off?

It is not quantity alone that decides, but the combination of cycle time, defect cost, ergonomics and staff availability. There are low-volume cells that pay for themselves because they replace a physically demanding workplace or because proof of joint quality is required.

How is the quality of a screw joint proven?

Via torque and angle, evaluated against a window rather than an end value. VDI/VDE 2862 classifies screw joints by risk and derives from that how precisely monitoring and documentation have to be done. Which category your joint falls into is set by your design.

Can a manual assembly station be automated step by step?

Yes, and often that is the better route. The step with the highest defect cost or the greatest physical load is automated first. The precondition is that the cell is designed for extension from the outset.

Enquiry

Tell us what it is about

A short description is enough for the first step. If it gets technical, we call.

Your contact

Alois Gruber

Managing Director · Engineering

+49 8381 89009-0sales@checktec.de

Prefer to go direct? To the contact page

Step 2 of 3

What type of project is it?