End-of-line testing at the end of the line

End-of-line testing is the last chance to find a defect in your own factory. It inspects the finished product and therefore also catches defects that arise late in the process. Its real difficulty is rarely the measurement technology but the range of variants.

End-of-line test cell with a dark enclosure, a swivel arm for the operator panel and lateral part feeding

Practice

Application examples

Application example to follow.

01Scope of services

What is included

Feature bundling

Several inspection types in one station, instead of a chain of individual stations each with its own transfer.

Variant handling

Exchangeable fixtures and parameterisable inspection programs, so one cell covers several products.

Marking and release

Marking, reading back and releasing in one step, so no unverified part carries a valid number.

Blocking and rework routing

A defined path for bad parts, including re-presentation after rework.

Record per part

All feature values with serial number, exportable to a QM system or test database.

Employee wiring a control cabinet, with the colour-sorted cable bundles in view

Standards

What we work to

Measurement capability

For each inspected feature separately. On an EOL station with many features that is the largest part of the verification effort.

Traceability

Result, serial number and time stamp belong together. Without that link the record is worthless in a field case.

Process

How it runs

  1. 01

    Features and variants

    What is inspected, on which products, and which variants are foreseeably coming?

  2. 02

    Plan the bundling

    Which features fit into one station without breaking the cycle time?

  3. 03

    Pre-test

    Verification of the critical features on real good and bad parts of all relevant variants.

  4. 04

    Build and capability proof

    Cell, fixtures, test equipment, evaluation, verification per feature.

  5. 05

    Commissioning

    Run-in during live operation, instruction of production and quality assurance.

Why CheckTec

Why us

End-of-line test cell with a dark enclosure, a swivel arm for the operator panel and lateral part feeding

Variants are the real subject

The measurement technology is usually manageable. What makes EOL stations fail is a range of variants that was not known at design time.

One universal cell instead of four dedicated machines

UnivoCheck is built for exactly this case: one base system, exchangeable fixtures, parameterisable inspection programs.

The record is part of the product

In a field case the test record decides whether a complaint can be assigned. That is why the data integration belongs to the scope of supply.

Frequently asked questions

Frequently asked questions

Inline or end-of-line?

Inline inspects during the process and enables process control and early rejection. End-of-line inspects the finished part and also catches defects that arise late. Where the follow-up cost per defective part is high, inline pays; with many variants a flexible EOL cell is usually better. Frequently both make sense.

How many variants can one EOL station cover?

That depends on how similar the products and the inspection features are. Where size and task are related, several variants are readily handled via exchangeable fixtures. With strongly differing geometry a shared station reaches its limits.

What happens to bad parts?

They are blocked or rejected, and the path back into production is defined. What matters is the re-presentation after rework: a reworked part has to run through the full inspection again, otherwise a gap appears in the evidence.

Enquiry

Tell us what it is about

A short description is enough for the first step. If it gets technical, we call.