Service
DGUV V3 & VDE testing
Whether portable equipment, a fixed installation or an electrical machine: we test under DGUV Vorschrift 3 and the relevant VDE standards, document the result in a test record and label tested equipment with an inspection sticker.

Scope of services
What is included
Portable equipment
Inspection to DIN VDE 0701-0702: electrical devices, extension leads, power strips and tools that are moved or relocated during operation.
Fixed electrical installations
Inspection of the fixed electrical installation to DIN VDE 0100-600 (initial inspection) or DIN VDE 0105-100 (recurring inspection).
Electrical machines
Inspection of the electrical equipment of machines to DIN EN 60204-1, including protective measures and safety-relevant devices.
Test record
Documentation of measured values, visual inspection and result per item or installation, as evidence for the trade association and insurer.
Inspection label
Marking of tested portable equipment with the next due date, clearly visible on the device.
Defect management
Faulty devices are marked and taken out of service, with a recommendation for repair or replacement.
Standards
What we work to
DIN VDE 0701-0702
Inspection after repair, modification and on a recurring basis for portable electrical equipment. Increasingly superseded by DIN EN 50678 and DIN EN 50699.
DIN VDE 0100-600 / 0105-100
Initial inspection of fixed electrical installations after erection or modification (0100-600), recurring inspection during operation (0105-100).
DIN EN 60204-1
Electrical equipment of machines. The basis for inspecting electrical machines under DGUV Vorschrift 3.
Process
How it runs
- 01
Survey
Recording the equipment, installations and machines to be inspected, matched against the inventory from the last inspection.
- 02
Visual inspection
Checking for external damage, labelling and correct use before measurement.
- 03
Measurement and functional test
Protective conductor resistance, insulation resistance and, depending on the item, further measurements to the relevant standard.
- 04
Labelling and record
Inspection label on the device, test record with measured values and result per item.
- 05
Due date
Proposal for the next inspection interval based on operating conditions and equipment type.
Why CheckTec
Why us
One inspection, three categories
Portable equipment, fixed installations and electrical machines are often commissioned separately. With us from one source, with one contact and one appointment.
Electrical design that already knows the machine
Whoever designed or built the switchgear themselves inspects it with a head start of knowledge about the circuit diagram and build.
Documentation that holds up to insurers and authorities
The test record and the inspection label are the evidence that the operator has met their duty under DGUV Vorschrift 3.
Part of the maintenance package
Electrical testing is also part of our PROTECT and PERFORMANCE service packages, see Maintenance & servicing.
Frequently asked questions
Frequently asked questions
Who has to have DGUV Vorschrift 3 inspections carried out?
Every operator of electrical installations and equipment is required to have their safe condition verified regularly by a competent person.
How often does portable equipment need to be inspected?
The interval depends on the equipment type and operating conditions and is set out in the risk assessment. We clarify binding intervals for your business during the initial inspection ({{TBD}}).
What happens when a defect is found?
The device is marked and taken out of service. Depending on severity, this is followed by repair, replacement or a re-inspection after the repair.
Do you also inspect machines from other manufacturers?
Yes, provided a circuit diagram or equivalent documentation is available. If it is missing, re-documentation is the first step.
Related services
Related
Enquiry
Tell us what it is about
A short description is enough for the first step. If it gets technical, we call.
Your contact
Timo Wiedemann
Head of Assembly · Installation & Service
Prefer to go direct? To the contact page
Step 2 of 3


