Assembly

Cabinet manufacturing

We build switchgear assemblies for machine and plant builders: single enclosures, cabinet rows, control desks, command boxes and terminal boxes. Either as pure contract manufacturing to your diagram, or as a complete solution in which electrical design, manufacturing, testing and documentation come from one source.

Employee in front of open control cabinets, with a colleague assembling one in the background

Scope of services

What is included

Single enclosures and cabinet rows

From a compact control cabinet to a multi-bay row with busbar system, including climate control and a cable exit concept.

Control desks, command and terminal boxes

Operator desks with HMI, local control stations and field distributors, matched to protection class and ambient conditions.

Contract manufacturing to your specification

You supply the diagram, bill of materials and layout. We build, wire, label, test and deliver to specification.

Complete solution with electrical design

Electrical design in EPLAN, space and thermal calculation, manufacturing, testing and documentation in a single order.

Retrofit and modernisation

Replacing obsolete components, aligning with current standards, adding diagnostics and energy metering inside the existing cabinet.

Labelling and identification

Consistent equipment identification per the diagram, machine-printed labels for wires, terminals and components.

Standards

What we work to

DIN EN 61439-1 and -2

General rules and power switchgear assemblies. Governs design verification, routine testing, temperature rise, short-circuit withstand and protection classes.

DIN EN 60204-1

Electrical equipment of machines. Applies as soon as the cabinet forms part of a machine.

CE conformity

Declaration of conformity and technical file. Who declares conformity is defined explicitly in the quotation, depending on whether we are a partial or full supplier.

Process

How it runs

  1. 01

    Review the documents

    We go through the diagram, bill of materials and enclosure layout and report anything that stands out from a manufacturing or normative point of view, before anything is ordered.

  2. 02

    Space and heat

    Mounting layout, clearances, cable routing and power loss budget. That determines whether a filter fan, cooling unit or heat exchanger is required.

  3. 03

    Procurement

    Ordering against the released bill of materials, with an eye on lead times and permissible alternatives for obsolete parts.

  4. 04

    Build and wiring

    Populating the mounting plate, wiring, labelling. Ferrules, cross-sections and colour coding per diagram and standard.

  5. 05

    Routine testing

    Visual and functional inspection, continuity of the protective bonding system, insulation resistance, dielectric test. The record is part of the delivery.

  6. 06

    Delivery

    Transport protection, documentation and, on request, on-site commissioning and instruction.

Why CheckTec

Why us

Design and manufacturing under one roof

The person drawing the diagram sits twenty metres from assembly. Questions from the shop floor are answered the same day, not at the next project meeting.

Retrofit is routine, not an exception

A substantial share of our cabinet work involves existing installations. Discontinued product lines, wiring that has grown over the years and missing drawings are the normal case for us.

The data link is already considered

If the cabinet is meant to deliver data, meaning OPC UA, Modbus or energy metering, the network side is not a new project but the next step, in the same building.

Components from established manufacturers

We build with components from Phoenix Contact, Murrelektronik and Rittal, with corresponding access to current product ranges and technical support.

Frequently asked questions

Frequently asked questions

Does CheckTec build single units or only series?

Both. Single cabinets and prototypes are as common as repeating small batches. With a series the effort per unit drops considerably, because mounting layout, test plan and labelling are created once and then reused.

Which standards govern manufacturing and testing?

DIN EN 61439 for the switchgear assembly and DIN EN 60204-1 as soon as the cabinet is part of a machine. Routine testing covers visual inspection, protective bonding continuity, insulation resistance and a dielectric test – essentially the VDE test also required for fixed electrical installations. The record accompanies every delivery.

Can I order manufacturing only and supply the diagram myself?

Yes, that is classic contract manufacturing. You supply diagram, bill of materials and layout; we build to specification. We report anything that stands out before production starts, but change nothing without your release.

Who is responsible for CE marking?

That depends on the scope of supply and is defined explicitly in the quotation. If we deliver a standalone switchgear assembly, we declare its conformity. If the cabinet is part of your machine, CE responsibility for the complete machine stays with you and we supply the documents you need.

What is the lead time?

It depends almost entirely on component availability, not on manufacturing capacity. We check the critical items on the bill of materials at quotation stage and name alternatives. Firm commitments follow that check ({{TBD}}).

Enquiry

Tell us what it is about

A short description is enough for the first step. If it gets technical, we call.

Your contact

Timo Wiedemann

Head of Assembly · Installation & Service

+49 8381 89009-0systems-sales@checktec.de

Prefer to go direct? To the contact page

Step 2 of 3

What type of project is it?