Assembly
Test rig construction
We build test rigs as complete systems: frame, fixture, drive, sensors, control and evaluation. The scope ranges from a manual inspection station with operator guidance to an automated cell with feeding and rejection.

Scope of services
What is included
Manual inspection stations
Operator-guided stations with display, acknowledgement and automatic recording, for small quantities and many variants.
Semi- and fully automatic test cells
With feeding, handling, inspection and rejection, optionally with robot or gantry.
EOL and inline test rigs
End-of-line inspection at the end of the belt, or inline integrated directly into the production process, for early defect detection without losing cycle time.
Measurement technology
Tactile gauges, force and displacement measurement, electrical tests, optical measurement, combined according to the feature.
Operator interface
Display of inspection result, feature values and defect image, management of inspection programs and variants.
Recording
Results with time stamp and part identifier, export into QM systems or databases.
Standards
What we work to
Measurement capability
Cg/Cgk study or MSA procedure to your specification, documented and part of the acceptance.
DIN EN 60204-1
Electrical equipment of machines. Governs operating modes, emergency stop and the tests of the rig itself.
Process
How it runs
- 01
Define the inspection features
Which feature, which tolerance, which consequence if exceeded. Without those three no test rig can be designed.
- 02
Select the measuring method
Optical, tactile, electrical or combined. Depending on tolerance, cycle time and accessibility.
- 03
Design and build
Frame, fixture, drive, wiring, control. Trials with real parts before delivery.
- 04
Capability verification
Cg/Cgk study or MSA procedure to your specification, documented.
- 05
Handover
Commissioning, instruction, documentation including the inspection instruction.
Why CheckTec
Why us
Test technology is this company's root
CheckTec was founded in 1991 for quality assurance systems. That is where the name comes from.
Mechanics, electrics and evaluation from one source
No split across a machine builder, a cabinet builder and a software house with three separate schedules.
Capability is part of the delivery
A test rig whose capability has not been demonstrated creates false confidence. For us the proof belongs to the scope.
Partners with substance
A long-standing partnership with Schorr Modell- und Formenbau for mechanical assemblies that are not built in house.
Frequently asked questions
Frequently asked questions
How long does developing a custom test rig take?
It depends on the features, cycle time and component availability. Standardised building blocks for control, HMI, drive, camera and lighting shorten concept work and quotation considerably. Binding dates follow concept release ({{TBD}}).
Do you also implement leak or electrical tests?
Yes, in combination with bought-in test instruments. These are connected through the controller so that all results come together in one record.
Can a test rig be converted later?
Yes, if it is designed for it. We favour exchangeable fixtures and parameterisable inspection programs over setups built for a single part.
How does test rig construction differ from a system solution like UnivoCheck?
UnivoCheck is a base system parameterised for many parts. A test rig is built for one particular task. Where the task is stable, the rig is the more direct route; where variants are coming, the base system is.
Related services
Related
One level up
This service is part of
Looking for a complete machine rather than a single service? Then the shorter route runs through the solution this work is part of anyway.
UnivoCheck, EOL test cell
Short product life cycles and shrinking batch sizes make dedicated inspection machines uneconomical before they have paid for themselves. UnivoCheck solves that with exchangeable fixtures and parameterisable inspection programs: one base system, many variants.
Burn-in system BIM
Electronic assemblies do not fail evenly over their service life. A share of failures sits at the very beginning, caused by production defects that a functional test does not reveal. A burn-in system stresses the assembly deliberately so those weaknesses surface in the factory rather than at the customer.
Enquiry
Tell us what it is about
A short description is enough for the first step. If it gets technical, we call.
Prefer to go direct? To the contact page
Step 2 of 3


