Retrofit
Retrofit and line integration on existing plant
A machine whose mechanics could last another ten years but whose controller is no longer available is the normal case in production areas that have grown over time. Retrofit replaces the electrics and the software without touching the mechanics. And it answers the question that always comes with it: does this become a substantial modification?
Substantial modification
CE under (EU) 2023/1230
DIN EN 60204-1

Benefits
Retrofit & line integration: your benefit
Retrofit is routine, not an exception
A substantial share of our work involves existing installations. Discontinued product lines, wiring that has grown over the years and missing drawings are the normal case for us.
The legal question comes first
Whether a substantial modification is involved decides half the project scope. We settle that before quoting, not at acceptance.
Re-documentation is possible
We survey installations without usable drawings and document them retrospectively. That is the precondition for any clean conversion.
Functions
What the cell handles

System modules
Retrofit & line integration: the building blocks
01
Survey
Record the machine on site, trace wiring and equipment. Where drawings are missing, re-documentation is the first step.
02
Controller replacement
Migration to current controller generations, adopting the function rather than the old program state one to one.
03
Drives and operating devices
Replacing obsolete inverters, panels and local control stations, often the actual trigger for the project.
04
Bringing safety up to date
Emergency stop circuits, door monitoring and shutdown paths at today's level, based on an updated risk assessment.
05
Adding data acquisition
Getting quantities, run times, faults and energy data out of a machine that was never built for it.
06
Linking and integration
Connecting to existing lines and higher-level systems, with defined interfaces instead of grown workarounds.
Technical data
Retrofit & line integration at a glance
| Principle | Renewing the control technology of an existing machine without replacing the proven mechanics. |
|---|---|
| Survey | Record the machine on site, trace wiring and equipment. |
| Controller replacement | Migration to current controller generations, adopting the function. |
| Drives and operating devices | Replacing obsolete inverters, panels and local control stations. |
| Safety engineering | Emergency stop circuits, door monitoring and shutdown paths at today's level. |
| Data acquisition | Quantities, run times, faults and energy data. |
| Linking | Connecting to existing lines and higher-level systems, with defined interfaces. |
| Substantial modification | Assessment of whether the conversion legally makes you the manufacturer — precedes the quotation. |
| CE conformity | Under (EU) 2023/1230, from 20 January 2027 with no transition period. |
| Electrical equipment | DIN EN 60204-1 — the basis for tests after the conversion and for documentation. |
Scope and equipment are designed around your task. We are happy to clarify exact dimensions, cycle time and further data in a personal conversation.
Datasheet (PDF)Frequently asked questions
Frequently asked questions
When the mechanics still hold up and the process stays unchanged. If the machine is structurally at its end or is meant to do considerably more, the conversion quickly costs more than a new build, because every change works against the existing structure.
Case studies
Matching case studies
Enquiry
Tell us what it is about
A short description is enough for the first step. If it gets technical, we call.
Your contact
Timo Wiedemann
Head of Assembly · Installation & Service
Prefer to go direct? To the contact page
Step 2 of 3