Before anything is built, it has to be clear what is being built. Project engineering clarifies whether a task can be automated at all, at what cost and in which form. At the end there is a functional specification a third party could build from.

Team discussing a floor plan on a large wall screen

Scope of services

What is included

Survey

Process, cycle time, parts, available space and existing interfaces, recorded on site rather than from photographs.

Feasibility with trials

Technical assessment wherever there is uncertainty. For optical inspection with real good and bad parts, for handling with a gripping trial.

Outline concept with options

At least two approaches with effort, risk and benefit, so a real decision is possible rather than a rubber stamp.

Component selection

Selecting sensors, actuators, control and drive technology to your specification, as the basis for costing and the functional specification.

Functional specification

Our answer to your statement of requirements: a description a third party could build from, with interfaces, acceptance criteria and realistic milestones. If you do not have a statement of requirements yet, we draw one up together with you on request.

Scheduling and rough costing

Solid enough for an investment decision, with critical supply items flagged.

Standards

What we work to

DIN EN ISO 12100

Risk assessment and risk reduction. It belongs in the concept phase, because the guarding concept co-determines the physical form.

DIN EN 60204-1

Electrical equipment of machines. Already relevant during project engineering for operating modes and shutdown concept.

Process

How it runs

  1. 01

    First conversation

    Task, constraints, goal. Usually on site, because photographs rarely convey the available space correctly.

  2. 02

    Feasibility analysis with trials

    Measure, document, try. For inspection tasks with real parts, not with data sheets.

  3. 03

    Outline concept and decision

    Options with effort and risk. What comes out is a decision, and it can go against automation.

  4. 04

    Project engineering

    Detailed concept, safety concept and component selection for sensors, actuators, control and drive technology.

  5. 05

    Functional specification

    Setting down what will be built, with which interfaces and against what the acceptance is measured.

Why CheckTec

Why us

Open-ended

We have advised against automation before, because changing the process was cheaper. A concept that only confirms what the supplier wants to sell is not a concept.

Trials instead of assumptions

The expensive surprises arise where nobody tried anything during the concept phase. Usually that is feeding and image acquisition.

The concept belongs to you

Concept and implementation can be ordered separately. Anyone who wants to place the build elsewhere can do so with our functional specification.

Frequently asked questions

Frequently asked questions

Can the planning phase be commissioned separately?

Yes. Concept and implementation can be ordered separately. The concept belongs to you and can be given to another supplier.

How long does the concept phase take?

For clearly defined tasks, typically a few weeks. What matters is how quickly sample parts and process data are available.

What happens if feasibility comes out negative?

Then that is what the report says. The outcome can be that a process change is cheaper than a machine, or that a feature cannot be separated optically with confidence. That answer is the real value of the phase.

Is the risk assessment included?

It is started during the concept phase, because the guarding concept co-determines the physical form. The complete assessment arises with the design and belongs to the scope of supply of the machine.

What is the difference between a statement of requirements and a functional specification?

The statement of requirements describes what you need and usually comes from you as the client. From it, during project engineering, we draw up our functional specification, which sets out how we will carry out the task. If you do not have a statement of requirements yet, we draw one up together with you on request.

Enquiry

Tell us what it is about

A short description is enough for the first step. If it gets technical, we call.

Your contact

Sebastian Gruber

Managing Director · Sales

+49 8381 89009-0systems-sales@checktec.de

Prefer to go direct? To the contact page

Step 2 of 3

What type of project is it?