Burn-in system BIM, stress testing before delivery

Electronic assemblies do not fail evenly over their service life. A share of failures sits at the very beginning, caused by production defects that a functional test does not reveal. A burn-in system stresses the assembly deliberately so those weaknesses surface in the factory rather than at the customer.

In short

A burn-in system operates assemblies for a defined period under elevated electrical and thermal load while monitoring them. The aim is to trigger early-life failures before delivery. CheckTec builds the required test positions with fixture, control, measurement, temperature management and recording as a complete system.

01Scope of services

What is included

Test positions and fixtures

Contacting the assemblies via spring-loaded contacts or connectors, designed for many mating cycles.

Drive and load

Supply, load profiles and operating states per position, so the assembly is stressed at the relevant operating point.

Temperature management

Operation at elevated ambient temperature, optionally cycled where alternating stress is required.

Monitoring during the run

Recording current, voltage and functional signals across the whole duration, not only at start and end.

Shutdown on fault

Detecting and isolating a single test position without interrupting the run of the others.

Recording

A trace per assembly with serial number, time of failure and fault pattern, exportable to quality assurance.

Measuring station in the workshop: clamped part, test fixture and a screen on a swivel arm

Standards

What we work to

DIN EN 60068

Environmental influences and test procedures for electrotechnical products. The basis for defining temperature, duration and cycles.

DIN EN 60204-1

Electrical equipment of machines. Governs protection, isolation and emergency stop of the system itself.

Process

How it runs

  1. 01

    Clarify the test specification

    Temperature, duration, load profile and abort criteria. These requirements come from your development team or from the customer specification.

  2. 02

    Define the contacting

    How is the assembly connected, and how often? Contacting is the part that wears first in continuous operation.

  3. 03

    Size the system

    Number of test positions from throughput and test duration, plus heat budget and electrical protection.

  4. 04

    Build and trials

    Manufacturing, programming, trial run with real assemblies.

  5. 05

    Handover

    Commissioning, instruction, documentation including the test instruction.

Why CheckTec

Why us

Employee in assembly production

Electrics, mechanics and software from one house

A burn-in position is in equal parts a control cabinet, a fixture and software. Here all three come from the same people.

The trace matters, not the end state

An assembly still running after eight hours may have dropped out in between. That is why recording runs continuously.

Test data for development

Time of failure and fault pattern are worth more for root cause analysis than a pass or fail message at the end.

Frequently asked questions

Frequently asked questions

How does burn-in differ from a functional test?

The functional test checks whether the assembly does what it should in its as-delivered state. Burn-in checks whether it keeps doing so under load over time. Neither replaces the other: the functional test usually comes before and after.

How long does a burn-in run take?

The duration comes from your test specification and ranges from a few hours to several days depending on the product. Together with the required output it determines the number of test positions.

Can burn-in be connected to existing test equipment?

Yes. Results can be handed over with the serial number to a higher-level test database, so functional test and burn-in appear in the same history.

Does a burn-in system test one hundred per cent of production?

Your test strategy decides that. Full testing is common for safety-relevant or hard-to-access assemblies, sampling where the failure rate is demonstrably low.

Enquiry

Tell us what it is about

A short description is enough for the first step. If it gets technical, we call.

Your contact

Alois Gruber

Managing Director · Engineering

+49 8381 89009-0sales@checktec.de

Prefer to go direct? To the contact page

Step 2 of 3

What type of project is it?