Skip to content

Test systems applications

Functional testing of assemblies and devices

Up to this point the inspection has asked whether the part looks right and is built right. Functional testing asks whether it also does what it should. It is the test closest to the customer, and therefore the one whose result is hardest to replace.

Measuring station in the workshop: clamped part, test fixture and a screen on a swivel arm

Practice

Application examples

Application example to follow.

01Scope of services

What is included

Electrical testing

Continuity, insulation, resistance, current and voltage traces and switching points, depending on the assembly.

Mechanical function

Actuation forces, switching travel, smoothness and detent points, recorded as a trace rather than a single value.

Leak tightness and flow

Via bought-in test instruments, connected to the same controller so all results land in one record.

Test sequence

Order, abort criteria and rework branches, so one station handles several test steps reliably.

Record per part

All measured values with serial number and time stamp, exportable to a QM system or test database.

Two employees at the open test cell, one explaining the camera setup, the other holding a tablet

Standards

What we work to

Measurement capability

To be demonstrated separately for each measured feature. A station with six test steps has six studies, not one.

Traceability

Measured values with serial number and time stamp, so it can be shown in a field case with which result the device left the factory.

Process

How it runs

  1. 01

    Test specification

    Which functions are tested, under which conditions, with which limits?

  2. 02

    Clarify the contacting

    How is the assembly connected and how often? Contacting is the part that wears first in continuous operation.

  3. 03

    Build

    Station, fixture, test instruments, control, operator interface with result display.

  4. 04

    Trials and verification

    Testing with real assemblies, capability proof per feature, instruction.

Why CheckTec

Why us

Measuring station in the workshop: clamped part, test fixture and a screen on a swivel arm

One record instead of five instruments

Bought-in test instruments are connected through the controller, so all results come together in one data set and nobody copies values by hand.

The trace instead of the end value

With actuation forces and switching points only the curve shows whether the behaviour is right. A single value can also be reached with a sticky mechanism.

The contacting is planned in

It is the most common cause of downtime on functional test rigs. That is why it is sized for the expected cycle count and planned as a wear part.

Frequently asked questions

Frequently asked questions

Can existing test instruments be integrated?

Yes. Bought-in measuring and test instruments can be connected through the controller, so sequence and record run together. A documented interface on the instrument is the prerequisite.

How many test steps fit into one station?

Technically many, economically the cycle time sets the limit. As soon as a single step takes long, for instance a leak test with a settling period, splitting across two stations is often cheaper than one overloaded station.

How does functional testing differ from burn-in?

Functional testing asks whether the assembly works now. Burn-in asks whether it keeps working under load over time. Neither replaces the other, and as a rule functional testing comes before and after the burn-in.

Enquiry

Tell us what it is about

A short description is enough for the first step. If it gets technical, we call.

Your contact

Alois Gruber

Managing Director · Engineering

+49 8381 89009-0sales@checktec.de

Prefer to go direct? To the contact page

Step 2 of 3

What type of project is it?