Test systems applications
Functional testing of assemblies and devices
Up to this point the inspection has asked whether the part looks right and is built right. Functional testing asks whether it also does what it should. It is the test closest to the customer, and therefore the one whose result is hardest to replace.

Practice
Application examples
01Scope of services
What is included
Electrical testing
Continuity, insulation, resistance, current and voltage traces and switching points, depending on the assembly.
Mechanical function
Actuation forces, switching travel, smoothness and detent points, recorded as a trace rather than a single value.
Leak tightness and flow
Via bought-in test instruments, connected to the same controller so all results land in one record.
Test sequence
Order, abort criteria and rework branches, so one station handles several test steps reliably.
Record per part
All measured values with serial number and time stamp, exportable to a QM system or test database.

Standards
What we work to
Measurement capability
To be demonstrated separately for each measured feature. A station with six test steps has six studies, not one.
Traceability
Measured values with serial number and time stamp, so it can be shown in a field case with which result the device left the factory.
Process
How it runs
- 01
Test specification
Which functions are tested, under which conditions, with which limits?
- 02
Clarify the contacting
How is the assembly connected and how often? Contacting is the part that wears first in continuous operation.
- 03
Build
Station, fixture, test instruments, control, operator interface with result display.
- 04
Trials and verification
Testing with real assemblies, capability proof per feature, instruction.
Why CheckTec
Why us

One record instead of five instruments
Bought-in test instruments are connected through the controller, so all results come together in one data set and nobody copies values by hand.
The trace instead of the end value
With actuation forces and switching points only the curve shows whether the behaviour is right. A single value can also be reached with a sticky mechanism.
The contacting is planned in
It is the most common cause of downtime on functional test rigs. That is why it is sized for the expected cycle count and planned as a wear part.
Frequently asked questions
Frequently asked questions
Can existing test instruments be integrated?
Yes. Bought-in measuring and test instruments can be connected through the controller, so sequence and record run together. A documented interface on the instrument is the prerequisite.
How many test steps fit into one station?
Technically many, economically the cycle time sets the limit. As soon as a single step takes long, for instance a leak test with a settling period, splitting across two stations is often cheaper than one overloaded station.
How does functional testing differ from burn-in?
Functional testing asks whether the assembly works now. Burn-in asks whether it keeps working under load over time. Neither replaces the other, and as a rule functional testing comes before and after the burn-in.
Related services
Related
Enquiry
Tell us what it is about
A short description is enough for the first step. If it gets technical, we call.
Prefer to go direct? To the contact page
Step 2 of 3


