Skip to content

Test systems applications

Shape and dimension inspection in series production

A caliper in the metrology room tells you whether a part was in order. Dimensional inspection in the line tells you whether the process is in order. The difference lies not in accuracy but in when the result is available.

Top view into the test fixture showing the marked measuring points on the part

Practice

Application examples

Application example to follow.

01Scope of services

What is included

Optical dimensional inspection

Contour, distance and diameter via camera and optics, without contact and fast, within the limits of imaging.

Tactile measurement

Probes and inductive displacement sensors where the tolerance is tight or the feature is not optically accessible.

3D capture

Height, flatness and form deviation via profile sensor, structured light or laser line.

Evaluation and trend

Feature values instead of pass/fail, so production sees a drift before it turns into scrap.

Data handover

Feature values to QM systems such as Q-DAS, so the data ends up where it is analysed.

Isometric design view of a row of control cabinets with a top-mounted enclosure

Standards

What we work to

DIN EN ISO 14253-1

Decision rules for proving conformity. It governs how measurement uncertainty is to be taken into account in the pass/fail decision.

Measurement capability

Cg/Cgk study or MSA procedure. As a rule of thumb the uncertainty must be considerably smaller than the tolerance, otherwise you are measuring the spread of the equipment.

Traceable calibration

The measuring devices used need traceable calibration, otherwise the whole body of evidence does not hold.

Process

How it runs

  1. 01

    Features and tolerances

    Which dimensions, which tolerances, which datums? A dimension without a datum cannot be measured reproducibly.

  2. 02

    Select the method

    Optical, tactile or combined, depending on tolerance, accessibility and cycle time.

  3. 03

    Pre-test

    Measurement on real parts, including boundary samples, to estimate the achievable uncertainty.

  4. 04

    Capability verification

    Repeat measurements, evaluation of spread and systematic deviation, definition of the action limits.

Why CheckTec

Why us

Top view into the test fixture showing the marked measuring points on the part

Tolerance before technology

The first question is not which camera but how tight the tolerance is. The method follows from that, and sometimes it follows that optical will not do.

Feature values instead of ticks

A dimensional inspection that only reports good or bad gives away its biggest benefit. The trace shows the drift before it becomes scrap.

Combined where necessary

Where optical inspection is not sensible we combine machine vision with tactile devices in the same station, evaluated through the same controller.

Frequently asked questions

Frequently asked questions

Which tolerances can still be checked optically?

That cannot be answered generally, because field of view, optics and the edge quality of the part interact. As a rule of thumb at least three to five pixels should fall on the smallest feature, and the uncertainty must be well below the tolerance. The pre-test with your parts provides the dependable figure ({{TBD}}).

Does inline dimensional inspection replace the metrology room?

Usually not entirely. It inspects at cycle speed and delivers trend data, but the traceable reference measurement stays a metrology task. The two complement each other: the line controls, the metrology room proves.

Why is resolution alone not a sufficient figure?

Because lighting, edge sharpness, temperature, the part fixture and the spread of the positioning all contribute to the uncertainty. A system with high resolution and a poor fixture measures worse than one with fewer pixels and clean mechanics.

Enquiry

Tell us what it is about

A short description is enough for the first step. If it gets technical, we call.

Your contact

Alois Gruber

Managing Director · Engineering

+49 8381 89009-0sales@checktec.de

Prefer to go direct? To the contact page

Step 2 of 3

What type of project is it?