Case study · Electronics
Integration and retrofit of another pick-and-place axis in two days
01Starting point
The challenge
For another pick-and-place unit in electronics manufacturing, CheckTec's proven modernization concept was applied again. The axis takes over the automated handling of PCB assemblies with a pneumatic gripper. The project included deploying the CheckTec standard axis, modernizing the PLC control and migrating communication from PROFIBUS to PROFINET. Wiring and the energy chain were also completely renewed. As with the comparable project, the particular challenge was the narrow two-day conversion window: the new unit had to be integrated into the existing system and coordinated with the neighbouring stations and production data acquisition. Careful preparation of all mechanical, electrical and software-related work was essential for that.
02Project parameters
Requirements
03Implementation
Our solution
- Preparation for the limited conversion window: installation situation, connections and interfaces were coordinated in advance. The work was prepared so that replacement and on-site integration could follow a clearly defined order.
- Deployment of the CheckTec standard axis: the axis solution was adapted to the existing system and the required handover positions. It takes over the automated transport of PCB assemblies between the designated stations.
- Control of the pneumatic gripper: opening and closing the gripper were linked to the axis movements and the releases from the adjoining plant sections, creating a defined sequence for pick-up, transport and placement.
- Modernization of the PLC and communication: the control software was matched to the new axis system, and the previous PROFIBUS communication was migrated to PROFINET within the project scope. The cross-line signal exchange and the PDA connection were carried over into the modernized solution.
- Complete renewal of the cable routing: wiring and energy chain were replaced and matched to the axis's movement paths. The new installation creates a clear basis for maintenance and service.
- Integration within two days: the prepared components and software functions were brought together on site, the motion sequences were set up, and the interplay with the existing system was commissioned.
04Value
The result
- Conversion window met: replacement and integration were completed within two days.
- Proven concept deployed again: the CheckTec standard axis again forms the basis for automated part handling in this unit.
- More uniform plant technology: the comparable modernization concept simplifies looking after both axis systems and creates common ground for maintenance and service.
- Modernized communication: the PROFINET connection links the renewed unit with the existing plant process and production data acquisition.
- Renewed electrical installation: new cables and a new energy chain replace the previous wiring.
- Repeatable handling: axis, pneumatic gripper and PLC work together for the defined pick-up and placement of the PCB assemblies.
Client
Electronics manufacturer (name withheld on request)