Case study · Automotive

Automated injection-moulded part removal with a KUKA robot and custom gripper

01Starting point

The challenge

Sixteen parts had to be removed from an injection mould and fed automatically into further processing: the task called for reusing an existing KUKA KR150 and equipping it with a purpose-built gripper tool. The particular challenge lay in the removal itself. After moulding, the parts stuck to the tool and had to be released in a controlled way without damaging or deforming them. That required gripping technology precisely matched to the part geometry and exact positioning within the confined tool space. At the same time, the robot and the injection moulding machine had to be closely coordinated: the approach move, part pick-up and retraction had to interlock reliably with the machine cycle. A defined fallback path also had to be provided for faults in the downstream process.

02Project parameters

Requirements

Production environment
Automotive production, injection moulding
Robot
Existing KUKA KR150
Removal
16 parts per removal cycle from a 16-cavity mould
Gripper tool
Part-specific 16-way gripper
Part requirement
Gentle release and removal without damage or deformation
Monitoring
Separate sensors for each of the 16 gripping positions
Interfaces
Coordination between the robot, the injection moulding machine and the downstream material flow
Further transport
Placement on a conveyor belt to the CheckTec test system
Fault placement
Separate bypass conveyor

03Implementation

Our solution

  • Custom-engineered gripper tool: development of a 16-way gripper whose locator geometry and layout match the parts and the mould's cavity pattern. The focus was on gently and reliably releasing the parts sticking to the tool.
  • Programming of the existing robot: setting up the motion sequences of the KUKA KR150 for precise entry into the open mould, part removal and subsequent transport. Matched approach and retraction moves account for the confined space and the sensitive parts.
  • Monitoring of every single gripping position: dedicated monitoring sensors were provided in the gripper for each cavity, so part pick-up can be checked per position and an incomplete transfer is detected.
  • Coordinated sequence with the injection moulding machine: coordination of the required releases, status messages and removal steps, so the machine cycle and the robot motion interlock in a defined order.
  • Automatic handover to the test technology: after removal, the robot places the 16 parts in order on a conveyor belt, which feeds them to the downstream CheckTec test system, described in a separate case study.
  • Defined material flow in case of a fault: on a corresponding fault message, parts are placed on a separate bypass conveyor, giving an alternative placement option alongside the regular transport path.

04Value

The result

  • Fully automatic part handling: manual handover is eliminated all the way from removal at the injection moulding machine to feeding the test system.
  • Gentle removal of all 16 parts: the matched gripping technology and robot motion allow controlled release without damage or deformation.
  • Repeatable pick-up and placement: defined positions and motion sequences create a consistent material flow.
  • Monitored part transfer: sensors at every gripping position make missing parts immediately visible.
  • Continued use of existing technology: the existing KUKA KR150 takes on the automated removal through new programming and a custom gripper tool.
  • End-to-end link between production and testing: the injection moulding machine, robot handling and the CheckTec test system are joined into one coordinated process.

Client
Automotive supplier (name withheld on request)